Copper King Project

Our Properties

Copper King

Advanced Stage Gold and Copper Exploration and Development

Copper King is a development stage gold and copper project located in southeast Wyoming, 20 miles west of Cheyenne. Its deposit is open in several directions, signifying additional exploration upside to its current gold resource.

History

The Copper King Project has experienced extensive historical exploration. Since 1938, at least nine historic drilling campaigns by seven companies, plus the U.S. Bureau of Mines, have been conducted, with drilling by five different operators since 1970 confirming mineralization.

Location

The Copper King project is located entirely on state land, making for an easier permitting process to put the project into production.

PEA Highlights

In 2012, Mine Development Associates (MDA) prepared an updated technical report and Preliminary Economic Assessment (PEA) in accordance with NI 43-101:

Class OZ AUEQ/TON G AUEQ/T Tons Tonnes OZ AU/TON G AU/T OZ AU Percent CU LBS CU
Measured 0.015 0.51 15,130,000 13,730,000 0.018 0.62 272,000 0.199 60,120,000
Indicated 0.015 0.51 44,620,000 40,480,000 0.015 0.50 654,000 0.183 162,880,000
Total 0.015 0.51 59,750,000 54,210,000 0.015 0.53 926,000 0.187 223,000,000
Class OZ AUEQ/TON G AUEQ/T Tons Tonnes OZ AU/TON G AU/T OZ AU Percent CU LBS CU
Inferred 0.015 0.51 15,620,000 14,170,000 0.011 0.38 174,000 0.200 62,530,000

Development Plans

We are planning to advance the Copper King project through a Pre-Feasibility Study and permitting strategy, and then continue to expand upon our current 1.5 million ounce gold equivalent resource.

2016

Update PEA For Current Cost Inputs

Assemble Top Technical Team to Advance Project

Initiate Permitting Strategy

2017

Work With Local Politicians For Project Support

Move Project To Pre-Feasability Study

Continued Project Advancement

Related Resources

Dive deeper into our efforts by reviewing publications, images, videos and more.

Learn More